Fields of application
After pre-priming the substrate, the Hesse anti-slip effect can for instance be used on coat hangers, the insides of drawers and for coating trays.
Technical specifications
Appearance |
colourless
|
Density series kg/l |
0.936
|
Flow time (+/- 15 %) |
29 s / DIN 53211 - 4 mm
|
Form of delivery |
fluid
|
Non-volatile content series % |
28
|
Profile of properties |
Slip-resistant
|
Proportion of renewable raw materials % |
0.7
|
VOC EU % |
71.779999 %
|
Number of coats (max) |
1
|
Amount per layer (minimum) |
100 g/m²
|
Amount per layer (max) |
120 g/m²
|
Total application volume |
120 g/m²
|
Mixing ratio (by volume) |
100 : 15 PUR Hardener DR 4078
|
Mixing ratio (gravimetric) |
100 : 15 PUR Hardener DR 4078
|
Information on use
Usage time |
3 h / 20 °C
|
Pot life |
3 h / 20 °C
|
Drying |
16 h / 20 °C
|
Stackable after |
> 24 h / 20 °C
|
Complete drying |
7 d / 20 °C
|
Surface preparation |
Apply Anti-slip effect DU 44709-0002 without lacquer sanding and after drying for 1 - 3 h at 20 °C when top coating on Hesse PU colour lacquers.
|
Substrate sanding grits from-to |
320 - 400
|
Lacquer sanding (grit) from - to |
320 - 400
|
Finishing |
For repair purposes, another coat of the same product can be applied after adequate drying and careful sanding to remove nibs.
|
Yield per coat |
8 - 9 m²/l
The spreading rate is heavily dependent on the type of application. The specifications relate to a liter of ready-for-use product, if necessary including hardener and thinner.
|
Storage temperature |
16 - 25 °C
|
Working temperature |
20 °C
|
Working viscosity |
28 s in 4mm
|
Particular instructions |
Pre-priming is possible depending on the desired finish and substrate, for example with: DG 534 / DG 4741-0001, DB 45245-(colour tone), DB 45205-(colour tone). Only use paper as an intermediate layer when stacking the coated and dried surfaces. Lacquer to lacquer or lacquer to surface contact can result in adhesions if stored without an intermediate layer. The minimum and maximum application quantities are also to be observed in this context.
|
General instructions on workmanship |
PU lacquers should not be applied and dried at material and room-temperatures below 18 °C and 40 % RH. Ideal values are: 20 - 25 °C, 50 - 65 % RH. Deviations will result in drying or hardening errors. In order to avoid adhesion problems, please sand the PU lacquered surfaces before applying fresh lacquer and apply lacquer to the sanded surfaces as soon as possible. Old lacquer and hardener mixtures affect the surface quality (adhesion/resistance). Freshly bleached substrates must undergo intermediate drying for at least 48 h at 20 °C before coating with suitable PU lacquers. If stored correctly (at least 20 °C room temperature), the final hardness of the coating is achieved after a week. Please apply a test coat under real conditions!
|
The coating process and the precise treatment parameters are adapted in each case to the respective application and drying conditions and can be found in the customer-specific process descriptions (surface techniques).
Material Safety Data Sheets
Contact
Our technical information is continually adapted to keep up to date with the latest technology and statutory regulations. The latest version is always
available online at www.hesse-lignal.de or talk to your local account manager. This information is for advice and is based on the best knowledge
available and careful research in line with the current state of the art. This information cannot be held as legally binding. We also refer you to our
terms and conditions of business. Safety data sheet is provided in accordance with EC regulation no. 1907/2006.